Powerful, ultra-modern, radio controlled and with automatic loader for the rods on board.
Our MI12 on tracks was recently the main character of a water well construction drilled by mud. It has been the French drilling company Cissé-Forageè, specialized in wells for agriculture, to realize it.
Some curious facts about the works’ execution?
✔️ The soil was composed mainly of limestone and sand.
✔️ The drilling provided an initial hole made with the 26" tricone up to a depth of 12 meters.
✔️ After that first step, it was planned to switch to a 20" tricone up to 45 meters
✔️ At the end, a 15" hole up to 100 meters.